Document Library
Ummbila Emoyeni One Wind Energy Facility and associated Electrical Grid Infrastructure
Non-technical Summaries
Ummbila Emoyeni Phase One comprises the development of a 155MW Wind Energy Facility (WEF) as well as the associated Electrical Grid Infrastructure (EGI). The following documents provide background to the Environmental Impact Assessment processes completed for the development of the project:
Wind Energy Facility Environmental Authorisation
The WEF received Environmental Authorisation in January 2023 (14-12-16-3-3-2-2160_WEF_EA.pdf). This Authorisation was subsequently amended to allow the project to be developed in Phases (14-12-16-3-3-2-2160-AM1.pdf).
The EA was further amended in September 2024 (14-12-16-3-3-2-2160-AM3.pdf) to provide for the change in Authorisation Holder name from Ummbila Emoyeni (Pty) Ltd to Ummbila Emoyeni (RF) (Pty) Ltd as well as the approval of a change in the road network layout.
The layout and Environmental Management Programmes (Ummbila WEF – Final Facility EMPr.pdf and Ummbila WEF Generic EMPr – Substation.pdf) for Phase One were approved in July 2023 (14-12-16-3-3-2-2160-MP1.pdf).
Electrical Grid Infrastructure Environmental Authorisation
The EGI received Environmental Authorisation in January 2023 (14-12-16-3-3-2-2162_Grid_EA.pdf). This Authorisation was subsequently amended to correct initial omissions by the Department of Forestry, Fisheries and Environmental Affairs (14-12-16-3-3-2-2162-AM1.pdf) before being amended to allow the project to be developed in Phases (14-12-16-3-3-2-2162-AM2.pdf).
The EA was further amended in September 2024 (14-12-16-3-3-2-2162-AM3.pdf) to provide for the change in Authorisation Holder name from Ummbila Emoyeni (Pty) Ltd to Ummbila Emoyeni (RF) (Pty) Ltd as well as the approval of a change in the road network layout.
The layout and Environmental Management Programmes (Ummbila EGI Generic EMPr – OHL.pdf and Ummbila EGI Generic EMPr – Substation.pdf) for Phase One were approved in July 2023 (14-12-16-3-3-2-2162-MP1.pdf).